Woodworking in the great white north.

Cedar Strip Canoe

These are the blog entries for the construction of my cedar strip canoe.

Part 1 – introduction

Part 2 – setup and starting planking

Part 3 – closing up one side of the hull

Part 4 - closing up the hull

Part 5 – sanding and epoxy/fiberglassing the outside

Part 6 – fiberglassing the interior of the canoe hull

Part 7 – final assembly of the gunwales and decks

Part 8 – final finishing and maiden voyage!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 26 other followers